Automation & Production
Assembly, inspection, handling, packaging and production readiness.

Insert Overmolding: Specify the Metal, Plastic and Silicone Interface Before Tooling
Plan insert location, shutoffs, surface condition, material compatibility, loading, inspection and functional validation before commissioning an overmolding tool.

Specify Automation by Accepted Products, Not Machine Speed
Specify automation by accepted-good output, inspection coverage, product variation, rejection, changeover and handover rather than mechanism speed alone.